top of page

WHEN CALLED FOR ROAD ASSIGNMENT AND INSTRUCTED TO PERFORM YARD SWITCHING AT TERMINAL WHERE YARD CREWS ARE ON DUTY

NEED: DATE, TIME OF INCIDENT, LOCATION, NAME OF MANAGER, LIST OF CARS SWITCHED, COMPLETE COPY OF FRA TIE UP, A PRINTER SNAPSHOT OF YARD CREWS ON DUTY, A LIST OF YARD, TRACKS, AND TIMES FOR EACH SEGMENT OF WORK.

CLAIMING 8 HOURS ON (DATE) I WAS WORKING ASSIGNMENT (ASSIGNMENT) ON DUTY AT (LOCATION) AT (TIME ON DUTY). UPON ARRIVAL AT (LOCATION), I WAS INFORMED BY (MANAGER) THAT I WAS TO RECLASSIFY CARS CONTAINED IN (TRAIN ID). ON THE DATE OF THE CLAIM, YARD ASSIGNMENT(S) (YARD ASSIGNMENT(S)) WERE ON DUTY AND AVAILABLE TO SWITCH OUT THE CARS FROM (TRAIN ID), BUT I WAS UTILIZED PER INSTRUCTIONS FROM (MANAGER).

©2021 by SMART LOCAL 316. 

bottom of page